Interior

  • Original Interior
  • Setee Under Construction
  • Finished Product
This vessels original design was built to accomodate regular household furniture. Although this seems desirable it is not an efficient use of space. The owner wanted to maximize floor space, improve seating, add storage and provide ability to dine...
  • Removal of Original Bar and Entertainment Center
  • Original Padded Ceiling Removed
  • Finished Beadboard Ceiling with Removable Teak Perimeter
  • Construction
The object of the project was to add a full service bar which inluded a wine chiller, ice machine and wet sink. It was also desired to upgrade all audio and visual components. All existing cabinetry was removed and new African Teak floor added and...
  • Old Crew Quarter
  • New Crew Quarter
  • Sink Moved to Head

The project goal was to change the crew quarters from a single bed to a double bed plus move the stateroom sink into the bathroom, update the finish out and add drawers and cedar lined closet.  The double bed was designed so it can easily be...